
Autoloader
Advanced Dicing Technologies Ltd.
9.1-12
• LU Dicer - the Linear Arm Load/Unload position coordinate for the
Dicer station
• LU Prealign - the Linear Arm Load/Unload position coordinate for
the Prealign station
9.1.3 Autoloader Operation
This section describes the operation of the Model 7100 with the Autoloader,
including the following topics:
• Loading and Unloading workpieces using the Autoloader
(see section 9.1.3.1)
• Running the Model 7100 with the Autoloader (see section 9.1.3.2)
• Loading a Cassette to the Autoloader (see section 9.1.3.3)
• Disable / Enable the Autoloader (see ssection 9.1.3.4)
• Recovery Operations (see section 9.1.3.5)
9.1.3.1 Loading / Unloading a Workpiece
If the Model 7100 is equipped with Autoloader, the Load/Unload procedure
can be carried out in three ways:
• Automatic Loading/Unloading a Workpiece using the Autoloader
• Manual Loading/Unloading from the Autoloader
• Manual Loading/Unloading without using the Autoloader
9.1.3.1.1 Automatic Loading/Unloading of a Workpiece
To Automatically Load/Unload a Workpiece:
Click the Run button. The system starts an Autorun cycle and
performs Loading/Unloading automatically
Kommentare zu diesen Handbüchern